Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program)

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

CEEQUAL Excellent (90.9%) – Whole Team Award
Version 5, November 2018 | Sweden

ClientSwedavia Airports
DesignerTengbom (Architect), Ramböll (Design)
ContractorJM Entreprenad
Assessors: Martin Ljungström (Sweco)

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Project Summary

Stockholm Arlanda airport keeps growing with an increasing number of passengers (approximately 6 million more travelers today than 2010) and therefore the airport is expanding its capacity. Part of the airports capacity expansion is a new maintenance area. The area consists of workshops, security control, garage, staff buildings and offices for the organization that maintains the airport, which varies from cleaning the landing strips from snow to maintaining gardens and green fields at the airport. The new maintenance area has a landscaping area of approximately 150,000 m2 and 14 buildings with a total floor area of about 50,000 m2.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Sustainability Aims

The purpose of the project has been to offer a sustainable and functional product for the various work units for the airport maintenance activities. There’s been an aim to raise awareness of the environmental impact caused during the life cycle of the project and, as far as feasible either mitigate or reduce these impacts. The client, Swedavia, designs and develops many new buildings at the airport. Swedavia has a comprehensive environmental policy with far reaching goals. For instance, Swedavia has the goal of having no carbon dioxide emissions from fossil fuels and to reduce the energy consumption of the airport by 2020.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Challenges and Achievements

The sustainable objectives were many. To mention a few examples, the project had a goal to replace the ecological values removed for new buildings and hard surfaces. The trees cut down at the site were transported to a nearby forest in the airport area and used as fauna depot. The operation area has a lot of paved surfaces for vehicle movements, and several large buildings, which leads to disadvantages such as increased storm water runoff and poor biodiversity. The project has therefore adopted the green roof concept (mats of sedum and moss) for all major buildings, resulting in reduced storm water runoff, and increased biodiversity.

All building walls are made of cross-laminated wood and the facade is also made of wood. This reduces the carbon dioxide emissions from the production compared with traditional concrete walls. All new buildings have energy performance far below Swedish general recommendations (25 to 50% better). LED-lighting is used outside and inside the buildings. The vehicle wash on the Operations area recycles the wash water and therefore uses ¼ of the water compared to a traditional vehicle wash.

All construction vehicles have used bio diesel during the construction to reduce the global warming impact. During construction, cuts and fill balance have been almost achieved, and most of the small surplus has been reused in another project on the airport.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

How did CEEQUAL influence your project?

The client, the designer and the constructor have worked together to achieve far reaching sustainability goals and all parties have contributed with ideas and activities. The result is a development that has significantly lower negative environmental and social impact than would have been the case without the CEEQUAL-certification. The Whole Team Award approach contributed to useful lessons learned for future projects for all involved parties. CEEQUAL has contributed so that the project has gained a holistic approach to sustainability.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Acknowledgments

The CEEQUAL team consisted of the following:

  • Martin Enquist, Project Manager, Owner – Swedavia
  • Anders Moberg, Environmental Coordinator, Owner – Swedavia/PE
  • Maggie Youseff, Environmental Coordinator, Construction – JM
  • Savvas Misikoglou, Environmental Coordinator, Construction – JM
  • Martin Ljungström, Lead CEEQUAL Assessor, Sweco
  • Madelene Ulmestig, Assisting CEEQUAL Assessor, Sweco
  • Anna Fält, Assisting CEEQUAL Assessor, JM/Ramböll
  • Sarah Adler, CEEQUAL Administrator, Sweco
Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL
Arlanda Airport Director Peder Grunditz is presented on behalf of the project Team their Excellent CEEQUAL Award by CEEQUAL Assessor Martin Ljungström, Sweco.

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

BREEAM And CEEQUAL On The Move
| CEEQUAL News

BREEAM & CEEQUAL: On The Move

BREEAM Director, Dr Shamir Ghumra provides insight on how BREEAM and CEEQUAL have helped city and town planners deliver better, ...
Read More
RAF Lossiemouth | CEEQUAL
| CEEQUAL case studies

RAF Lossiemouth – AOS Project

The project is a full refurbishment of all major airside pavement surfaces at RAF Lossiemouth for a new Boeing P8 ...
Read More
Stockholm Extended Metro Arenastaden Plattform | CEEQUAL
| CEEQUAL case studies

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...
Read More
Old Colwyn Coastal Defence and Active Travel Scheme | CEEQUAL
| CEEQUAL case studies

Old Colwyn Coastal Defence and Active Travel Scheme

The scheme represented an opportunity to build on the success of previous phases of the Colwyn Bay Waterfront Project with ...
Read More
Viking Link Bicker Fen Access Road | CEEQUAL
| CEEQUAL case studies

Viking Link (Bicker Fen) Access Road

The Viking Link team used CEEQUAL to deliver a sustainability-driven project. They achieved a 30% reduction in kgCO2 equivalent of ...
Read More
Strule SEC – Site Preparation Works
| CEEQUAL case studies

Strule SEC – Site Preparation Works

The purpose of the project was to redevelop the former army barracks at Lisanelly and St Lucia and to provide ...
Read More

Get in touch

Contact us now or call us on 0333 014 7880 if you would like to talk to our team about how CEEQUAL can support you.