Stockholm Extended Metro: Nacka/Södermalm/Söderort

The Stockholm Metro extension is a sustainable transport project that expands the public transport opportunities within the region. The project increases the resilience of the region’s transport system by relieving the existing system and offering new itineraries.

CEEQUAL Excellent Sustainability rating (80.1%) – Client & Outline Interim Award
Version 5, April 2021| Sweden

Assessors: Sara Nottebohm-Kaiser, Arega Projektledning
William Kenttä, Stockholms Lans Landsting
Hanna Novakovic, Projectpartner AB
Michaela Rosenholm, AF Infrastructure AB
Verifier: John Logan, McLaughlin & Harvey Ltd
Designers: Tyréns, Ramboll, White Arkitekter, WSP,
Sweco/TYPSA
Client: Extended Metro Administration, Region
Stockholm

Project Summary

The Stockholm Extended Metro project is aimed at increasing the city’s public transport capacity by extending the Stockholm Metro system. Whilst it is a major challenge to build a metro in a densely populated urban environment, this exciting project is considered essential in order to support the sustainable growth of the rapidly developing region.

The extended metro project, which will relieve intense Stockholm Metro traffic between T-Centralsen and Slussen, comprises of three elements:

  • Nacka: includes the Sickla – Järla – Nacka extension.
  • Södermalm: Includes the Kungsträdgården – Sofia – Hammarby kanal extension.
  • Söderort: Includes the Gullmarsplan – Slakthusområdet – Sockenplan extension.

Key Facts

 

  • The Stockholm Metro will be extended by 11.3 kilometres
  • All track tunnels will be constructed in rock
  • 2,180,000 cubic metres of solid rock will be blasted away
  • 57,000 cubic metres of concrete will be used
  • Operation of the extended lines is planned for 2030

Project Map

CEEQUAL’s Role

Why was CEEQUAL used?

Sustainability is an important consideration for the Extended Metro Administration, as demonstrated by the “Sustainability strategy for the Extended Metro Administration”. This was developed at an early stage in order to be implemented throughout the whole Stockholm Metro project, leading to the deployment of key goals and requirements for the design and construction phase.

The role of CEEQUAL was therefore to enable sustainability performance of the project to be measured against international standards, and to help the project achieve systematic and integrated sustainability work.

How did using CEEQUAL influence the project?

The use of CEEQUAL provided a driving force to deal with with issues that are not governed by law, including social issues. It also contributed to motivation and commitment among employees, triggering the competitive instinct to aim for high achievement. By using CEEQUAL, it helped to ensure that the project remained on track to achieve its sustainability ambitions.

Learn more about the Stockholm Extended Metro project's key achievements below:

People and Communities

A major success has been that the project has involved the local community and stakeholders throughout the planning process.

Consultation has been conducted in several stages and shaped in order to reach those most affected and concerned. Consultations have been held in several places along the location of the Stockholm Metro extension and have also been conducted digitally through emails and newsletters, as well as exhibited documents at Region Stockholm and the municipality’s premises. Consultation documents have been published on the website and a link has been published in an advertisement and in mail letters.

Comments are communicated in writing and all opinions are evaluated by the project team to determine whether it entails revisions of the design work or regarding working methodology/implementation. Views are summarised and responded to in a consultation report which is published on the web so that the public can take part in the responses.

Land Use and Landscape

The process for choosing the location of the project has been extensive and has included many different factors and conditions. The new stations for the Stockholm Metro extension have been placed to be accessible to future passengers, while we strive to have as little impact as possible on the environment and human health during the construction period. This has been achieved through the JP process, which provides an opportunity to weigh different alternatives against each other and land on a solution that provides benefits for the residents.

The Historic Environment

It is challenging to build in a city with significant cultural heritage and history, such as Stockholm. The project has integrated previous investigations with extensive further investigations and inventories regarding the historical environment, to determine how it is affected and how this can be minimised. Checks are carried out continuously throughout the process.

Ecology and Biodiversity

As far as possible, the project has avoided affecting the valuable natural environment. To this end, the team have carried out investigations and produced inventories to map protected animal and natural environments. Further, specific requirements have been set where there is a need for special handling.

The Water Environment

The legal process for the environmental permit has meant that the project has strict requirements to comply with regarding groundwater impact. Homes and business located within the project’s immediate environment are inventoried based on their sensitivity to groundwater lowering, and groundwater levels are continuously monitored in accordance with a comprehensive control program and maintained if necessary via infiltration.

Transport

The Stockholm Metro extension is a sustainable transport project that expands the public transport opportunities within the region. The project increases the resilience of the region’s transport system by relieving the existing system and offering new itineraries.

We should all be proud of the sustainability work that permeates the entire administration. The metro expansion is a sustainability project where a dividend on the investment comes when we are finished and the trains start rolling.

Martin Hellgren, Head of South Department, Stockholm Extended Metro

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

A6 Randalstown to Castledawson Dualling

A6 Randalstown to Castledawson Dualling

Delivered by the Department for Infrastructure the A6 Dualling Scheme upgrades 14.7 kilometres of Transport Corridor between Randalstown and Castledawson, ...
E18 Rugtvedt Dørdal | CEEQUAL

E18 Rugtvedt – Dørdal

The project is a 16.5km four-lane motorway in Telemark, Norway with a 110 km/hour speed limit. The state-owned company, Nye ...
Lahti Southern Ring Road (Vt12), VALTARI alliance

Lahti Southern Ring Road (Vt12), VALTARI alliance

This project, undertaken by the VALTARI alliance, involves the construction of a 4.5km southern ring road, bypassing the center of ...
RAF Lossiemouth | CEEQUAL

RAF Lossiemouth – AOS Project

The project is a full refurbishment of all major airside pavement surfaces at RAF Lossiemouth for a new Boeing P8 ...
Stockholm Extended Metro Arenastaden Plattform | CEEQUAL
| CEEQUAL Case Studies, Rail, Scandinavia

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...