Project Summary

Design and construction of the new Reading sewage treatment works is being undertaken by an Alliance consisting of the client Thames Water Utilities Limited, Taylor Woodrow and Black & Veatch. The main drivers for the £80m project are to meet new regulated standards for effluent discharge and sludge disposal in addition to eliminating odour nuisance.

The foundations for the project’s CEEQUAL success lay in Thames Water’s determination to set very high standards of environmental performance as one of the initial project objectives – a fact illustrated by the contractual emphasis on environmental management and the presence in the project team of a dedicated Environmental Manager. A thorough Environmental Impact Assessment, completed prior to commencement, contained extensive mitigation measures for the construction phase and enhancement proposals as part of the scheme design – important environmental aspects of civil engineering which are highlighted by the CEEQUAL process. Examples of the former are the air quality and landscape strategies agreed with Reading Borough Council whilst enhancements include creation of mounding as invertebrate sub-strate and the planting of over 20,000 native trees.

The Alliance made an early decision to operate an Environmental Management System (EMS) with the aim of gaining certification to ISO14001. Having achieved certification it is no surprise that the ‘Project Environmental Management’ section of CEEQUAL was one of the project’s highest scoring elements.

Although a somewhat detailed design was required for Planning purposes, thus constraining total design freedom, the scheduling and tracking of decisions on all environmental design matters once on site ensured that nothing ‘slipped through the net’ in the course of making the many decisions that a project of this complexity requires. The ‘Environmental Design Checklist’ is reviewed every two months and all decisions and changes signed off once implications and agreements are reached. This process, and the results from it, is a further contributory factor to the high scoring in the CEEQUAL assessment.

From the early days of extensive site remediation, when an unexpected colony of water voles was successfully relocated under a licence from English Nature, to site controls as part of the EMS, the project to date has a very good environmental record.

Gallery

Reading Sewage Treatment Plant | CEEQUAL

 

Reading Sewage Treatment Plant | CEEQUAL

Reading Sewage Treatment Plant | CEEQUAL

 

Reading Sewage Treatment Plant | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

New Low Level Waste Facility

New Low Level Waste Facility

The project involved the Design and Build of two sub-surface vaults for the disposal of solid low-level radioactive waste from ...
E16 Bagn-Bjørgo, Norway

E16 Bagn-Bjørgo, Norway

E16 Bagn–Bjørgo is an 11.1 km stretch of the main road between Norway’s capitol Oslo and the second largest city, ...
Olympic Park: Media Hub Multi-Storey Car Park | CEEQUAL

Olympic Park: Media Hub Multi-Storey Car Park (MSCP)

The design and construction process responded to the high standards for sustainability set out by the Olympic Delivery Authority, achieving ...
Frodsham Wind Farm
| CEEQUAL Case Studies, Energy, UK

Frodsham Wind Farm

Frodsham Wind Farm is one of England’s largest onshore generating stations, and the largest in the Cheshire region, with an ...
Meadow Lane Waterfront Regeneration

Meadow Lane Waterfront Regeneration

Over a five year period there has been quality improvements to the Nottingham Beeston Canal towpath where pedestrian counters and ...
Glenconway Wind Farm
| CEEQUAL Case Studies, Energy, UK

Glenconway Wind Farm

The Glenconway Wind Farm was developed by Gael Force Renewables Ltd, a Joint Venture between McLaughlin & Harvey, Barr and ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags