Glencorse Water Treatment Works Part 2

Glencorse Water Treatment Works Part 2 | CEEQUAL

CEEQUAL Excellent (84.5%) – Whole Project Award + Interim
Version 4, Dec 2011 | Penicuik, Scotland

Winner of a CEEQUAL Outstanding Achievement Award 2013 for Community Relations

ClientScottish Water
DesignBDPBlack & Veatch and ERM
ConstructionBlack & Veatch
Assessor: Neil McCulloch

Project Summary

Scottish Water’s new Glencorse Water Treatment Works (WTW) is delivering 21st century drinking water to around 450,000 people across Scotland’s modern capital city. The works replaces two ageing facilities at Fairmilehead and Alnwickhill, which despite having served the city well for more than a century, now need replacing.

Combining engineering feasibility reports with the results of the largest ever community consultation in Scottish Water’s history the site at Glencorse in Midlothian was chosen for the project to take place.

Capable of supplying Edinburgh with up to 175-million litres of clear, fresh drinking water everyday, the Glencorse project has sustainability at its core. A third of the works energy needs will be provided by an on-site hydro turbine. This is driven by the raw water which arrives from reservoirs in the Borders using gravity alone.

This raw water supply is treated beneath the largest ‘grass’ roof in Scotland, before being stored in a 90 million litre storage tank – one of the largest in Europe – and is delivered to customers across the city, again using gravity alone. Rain water harvested from the ‘grass’ roof is passed to bio-diverse wetlands that provide a rich habitat for indigenous plants, animals and insects.

Glencorse Water Treatment Works Part 2 | CEEQUAL

 

Influence of CEEQUAL

Considering CEEQUAL, Scottish Water and Black & Veatch introduced a world first, a mobile pipeline production unit. The plant was located next to the trunk main route allowing engineers to roll the pipes out of the factory and straight into the ground. This helped to save more than a million lorry miles and the associated carbon dioxide emissions.

Tunnelling underneath the Edinburgh City Bypass allowed work on the pipeline to progress without disturbing the thousands of commuters who use this vital artery every day.

Achievements

The Historic Environment

Following early archaeological investigations a Roman Marching Camp was discovered. Again neighbours were consulted to decide the relocation of the treatment building, preserving this historic site. This information was presented along with Cromwellian finds and evidence of a WWII Army Camp that was unearthed during excavations – resulting in 177 visitors to an Archaeological Open Day for Residents.

Waste Management

Spoil from initial excavation work was stored on site, to be used in landscaping the facility, blending it into the Pentland Hills. This helped to reduce construction traffic by 75%, making local roads safer. The use of recycled materials on-site also exceeded 25%.

Effects on Neighbours

Those residing round the WTW’s perimeter have been consulted throughout, providing input into the height and scale of final landscaping. Homeowners were even consulted on the location of individual trees providing final landscaping.

Award Presentation

Glencorse Water Treatment Works Part 2 | CEEQUAL

Glencorse Water Treatment Works Part 2 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

BREEAM And CEEQUAL On The Move
| CEEQUAL News

BREEAM & CEEQUAL: On The Move

BREEAM Director, Dr Shamir Ghumra provides insight on how BREEAM and CEEQUAL have helped city and town planners deliver better, ...
Read More
RAF Lossiemouth | CEEQUAL
| CEEQUAL Case Studies

RAF Lossiemouth – AOS Project

The project is a full refurbishment of all major airside pavement surfaces at RAF Lossiemouth for a new Boeing P8 ...
Read More
Stockholm Extended Metro Arenastaden Plattform | CEEQUAL
| CEEQUAL Case Studies

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...
Read More
Old Colwyn Coastal Defence and Active Travel Scheme | CEEQUAL
| CEEQUAL Case Studies

Old Colwyn Coastal Defence and Active Travel Scheme

The scheme represented an opportunity to build on the success of previous phases of the Colwyn Bay Waterfront Project with ...
Read More
Viking Link Bicker Fen Access Road | CEEQUAL
| CEEQUAL Case Studies

Viking Link (Bicker Fen) Access Road

The Viking Link team used CEEQUAL to deliver a sustainability-driven project. They achieved a 30% reduction in kgCO2 equivalent of ...
Read More
Strule SEC – Site Preparation Works
| CEEQUAL Case Studies

Strule SEC – Site Preparation Works

The purpose of the project was to redevelop the former army barracks at Lisanelly and St Lucia and to provide ...
Read More

Get in touch

Contact us now or call us on 0333 014 7880 if you would like to talk to our team about how CEEQUAL can support you.